How will the floorplan of the new school look? (i.e. separate gym, auditorium, cafeteria etc.)

Posted by:

The new school design cannot be developed until/unless the bond passes.  The architect designated for the project will design the school based on specifications provided by the District, the Steering Committee, and Transition teams.  We recognize the Tanglewood community’s commitment to maintaining the same characteristics in the new school as we currently have at the existing Tanglewood.

Author: